Services:

  • Tenant Improvement
  • Infrastructure Upgrades
  • MEP Engineering
  • Construction Administration

Project Highlights | Special Features:

  • MEP design and development of  a complex four-phase construction plan in order tointegrate a temporary store within and during the build-out of a new, permanent space.
  • Re-use and re-purpose more than 50% of the ductwork and HVAC systems to reduce construction cost for the Owner.

Building Types:

  • High-End Retail

Project Size:

  • 3,500 SF
  • 2-levels

Social

#iFactorMEP @iFactorMEP

© iFactor 2024