Services:

  • Energy Audit
  • Dust Collection System Design
  • Energy Efficiency Improvements
  • MEP Engineering
  • Construction Administration

Project Highlights | Special Features:

  • Manufacturer of flooded lead-acid batteries.
  • Handling of the lead plates requires dust collection and exhaust to maintain OSHA and AQMD compliance.
  • Designed re-configuration of assembly line and conversion to a more efficient dust collection hood.

Building Types:

  • Assembly Plant

Project Size:

  • 250,000 SF

Social

#iFactorMEP @iFactorMEP

© iFactor 2024