Assessment study of the East Campus network operation center’s (NOC), HVAC, UPS, and standby emergency generator systems.
Managed contractor bidding during the procurement process on behalf of the University.
Phased over time to protect project capital.
Criticality Level: Tier 2
Library
Reconfigured existing infrastructure systems to support additional IT infrastructure.
High performance design solutions improved the sites space utilization, increased UP capacity, provided redundancy for electrical systems and upgraded HVAC systems with more net-zero solutions and operational optimization.
Building Types:
Higher Education, Library, Network Operation Center