Services:

  • Single Point of Failure Analysis (SPOF)
  • Corrective Action Plan
  • Arc Flash Study
  • Infrastructure Upgrades
  • MEP | FP Engineering
  • Operations & Maintenance Manual
  • Construction Administration
  • Commissioning

Project Highlights | Special Features:

  • Sensitive Compartmented Information Facility (SCIF).
  • Emergency engineering support for system recovery and site stabilization after critical failures.
  • Design of an electrical power distribution system, integration of UPSs, STSs, PDUs and diesel generators for reliable, redundant and maintainable systems.
  • Multi-year City contract.

Building Types:

  • Communications Complex

Project Size:

  • 15,000 SF

Social

#iFactorMEP @iFactorMEP

© iFactor 2024