Services:

  • UPS & Generator System Replacements
  • Single Point of Failure Analysis
  • 5-year Master Plan Development
  • MEP Engineering
  • Owner Representative
  • Commissioning

Project Highlights | Special Features:

  • Design engineer, Owner’s Representative, and Commissioning Authority for data center infrastructure upgrade project.
  • Assisted First Hawaiian Bank with implementing a Method of Procedure (MOP) process for critical infrastructure construction projects.
  • Follow-up systems training for First Hawaiian Bank building engineers.
  • Capacity: 2.5 MW Generator Plant.
  • Criticality Level: Tier-3

Building Types:

  • Data Center

Project Size:

  • 300,000 SF
  • Raised Floor: 15,000 SF

Challenges:

  • Maintaining 100% uptime.
  • Critical infrastructure upgrades in a “ live” data center.