Services:

  • Campus Master Plan
  • Prime Consultant
  • System Assessment|Upgrade
  • Critical Infrastructure Master Plan
  • MEP Engineering
  • Life Cycle Cost Analysis
  • Construction Cost Estimating

Project Highlights | Special Features:

  • Multi-year rehabilitation master plan for the aging infrastructure systems.
  • 7-year master plan in aiding transition of a 30 year old healthcare campus.
  • Upgrades anticipated to yield a dramatic increase in energy performance with a projected 20% utility cost savings.

Building Types:

  • Medical Center Campus, Hospital, MOB, Parking Structure

Project Size:

  • 840,000 SF (medical center)
  • 249,000 SF (parking structure)